What is a provisional sum?

A provisional sum is an allowance in a building contract for work whose scope or quantity cannot be properly known when the contract is signed, such as excavation through rock or connecting services. The final price is adjusted to the actual cost once the work is done.

Provisional sums exist because some work cannot be priced honestly until the ground is opened or the design is finished. Common examples are excavation, retaining walls, site works, service connections and landscaping.

The key difference from a prime cost sum is what is uncertain. With a prime cost sum, the work is known and the product is not chosen. With a provisional sum, the work itself is uncertain. Mixing the two up on a quote makes the final adjustment harder to explain.

The risk is a provisional sum that lands well over allowance. A builder who sets it too low to win the job, or who does not flag early that costs are tracking over, ends up in an argument with the client at the end rather than a conversation during the build. A good habit is to tell the client in writing as soon as the actual cost looks likely to exceed the allowance.

State home building laws put limits on how provisional sums may be used in residential contracts, including how they must be identified and what the builder must do when actual costs differ. Requirements vary by state, so use a contract form designed for the state you build in and check what it says about adjustments and the client's approval.